Feature Article

Monitoring Environmental Conditions

Piling work to rear of Granary - © John Sturrock

Piling work to rear of Granary
© John Sturrock

Noise Monitoring

We are setting up three noise monitoring receptors at York Central, Camley Street and at the new Construction Skills Centre on York Way.

These monitor construction noise levels and monthly reports will be provided to the London Borough of Camden. In addition, regular manned surveys will be carried out at sensitive locations during periods of significant construction activity.

Air Quality Monitoring

Five permanent air quality monitoring points have been identified as suitable for measuring any changes in air quality around the development.

The Camley Street receptor is now up and running and data is being collected by the King’s College Environmental Research Group.

Consent has been obtained to install the necessary equipment at the four other sites and the equipment will shortly be installed.

Articles

Fountains being installed in Granary Square - © John Sturrock

Open spaces begin to take shape

By October, 4,500 staff and students will be working and studying in the newly completed University of the Arts London's campus.


Notices

1st December 2011

The big clean up



Please select an area of interest: